Von der Staumauer Luzzone
hiking · summer· SAC hiking T2
Source ascent: 3 h 30 min
Glacier assessment not confirmed. A source description does not establish current path access.
Mountain hut
Setting: Alpe Motterascio at the southern edge of the Greina plateau in Valle di Blenio
Notice: Hut is closed for winter after summer 2026. Winter room available from 16 October 2026; no running water or winter toilet. Staffed reopening planned for 12 June 2027. Source read 2026-10-24.
hiking · summer· SAC hiking T2
Source ascent: 3 h 30 min
Glacier assessment not confirmed. A source description does not establish current path access.
hiking · summer· SAC hiking T2
Source ascent: 2 h
Source descent: 1 h 30 min
Glacier assessment not confirmed. A source description does not establish current path access.
hiking · summer
Source ascent: 7 h–8 h
Glacier assessment not confirmed. A source description does not establish current path access.
hiking · Grade unconfirmed · glacier assessment unknown
hiking · Grade unconfirmed · glacier assessment unknown
hiking · Grade unconfirmed · glacier assessment unknown
hiking · Grade unconfirmed · glacier assessment unknown
hiking · Grade unconfirmed · glacier assessment unknown
hiking · Grade unconfirmed · glacier assessment unknown
ski touring · WS+ · glacier assessment unknown
Source ascent: 5 h
ski touring · ZS- · glacier assessment unknown
Source ascent: 5 h
ski touring · Grade unconfirmed · glacier assessment unknown
Source ascent: 5 h–6 h
Original grade scales are retained. Mountain hiking, mountaineering and ski touring grades describe different skills. Times belong to their published direction and variant.
These are published route descriptions. Only a separately qualified mapped connection can be used for planning; proximity between huts does not establish a walking route.
hiking · Grade to confirm
Glacier assessment unknown. Reference only; no qualified connection offered here.
Source reference time: 6 h
hiking · Grade to confirm
Glacier assessment unknown. Reference only; no qualified connection offered here.
Source reference time: 7 h
hiking · Grade to confirm
Glacier assessment unknown. Reference only; no qualified connection offered here.
Source reference time: 2 h 30 min
To Capanna Adula UTOE
hiking · Grade to confirm · reference only.
Source reference time: 6 h
To Capanna Scaletta
hiking · Grade to confirm · reference only.
Source reference time: 2 h
To Capanna Bovarina
hiking · Grade to confirm · reference only.
Source reference time: 5 h
To Capanna Adula CAS
hiking · Grade to confirm · reference only.
Source reference time: 5 h
To Rifugio Scaradra
hiking · Grade to confirm · reference only.
Source reference time: 3 h
Capanna Scaletta SAT: Etappe 8 Via Alta Crio: Capanna Motterascio – Capanna Scaletta
hiking · T2 · reference only.
Source ascent: 2 h 30 min
Confirm your dates and reservation with the hut. Published opening periods and usual month patterns do not show available beds or current path conditions.
Hut opening & reservation information ↗Bedding: duvets
Water: not guaranteed; terrace fountain may freeze, otherwise melt snow
Source read 2026-10-24· Motterascio — location, ordinary facilities and winter-room requirements ↗Bedding: duvets; sleeping liner obligatory, available to rent or buy
Dogs: not inside hut; sheltered woodshed with blanket and bowls, dog sleeps unaccompanied; notify in advance
Water: operator describes spring water as potable during staffed operation, subject to natural supply
Source read 2026-10-24· Motterascio — bedding, dietary requests, water, power and dogs ↗Notice: Hut is closed for winter after summer 2026. Winter room available from 16 October 2026; no running water or winter toilet. Staffed reopening planned for 12 June 2027.
Source read 2026-10-24· Michela Motterascio — 2026 closure, winter-room opening and planned 2027 reopening ↗Booking method: online system for winter-room stays and summer 2027
Source read 2026-10-24· Michela Motterascio — 2026 closure, winter-room opening and planned 2027 reopening ↗Notice: Bus to Ghirone Aquilesco; source describes alpine bus to Luzzone or Pian Geirètt daily July/August and weekends September, without a specific timetable year. Limited Garzott parking; dam parking offers longer walking approach.
Source read 2026-10-24· Motterascio — summer approach choices, onward huts and distinct winter hazards ↗Unstaffed room: reservation obligatory through online system; confirmation gives access information
Source read 2026-10-24· Motterascio — location, ordinary facilities and winter-room requirements ↗Association profile: complete. Operator notices: complete. These checks do not rate the paths around the hut.
Location: OpenStreetMap. Source facts and map locations retain their own provenance.