Skip to content

Mountain hut

Capanna Motterascio CAS

Setting: Alpe Motterascio at the southern edge of the Greina plateau in Valle di Blenio

Notice: Hut is closed for winter after summer 2026. Winter room available from 16 October 2026; no running water or winter toilet. Staffed reopening planned for 12 June 2027. Source read 2026-10-24.

Approach choices

Von der Staumauer Luzzone

hiking · summer· SAC hiking T2

Source ascent: 3 h 30 min

Glacier assessment not confirmed. A source description does not establish current path access.

Etappe 7 Via Alta Crio: Rifugio Scaradra – Capanna Motterascio

hiking · summer· SAC hiking T2

Source ascent: 2 h

Source descent: 1 h 30 min

Glacier assessment not confirmed. A source description does not establish current path access.

Vals

hiking · summer

Source ascent: 7 h–8 h

Glacier assessment not confirmed. A source description does not establish current path access.

More source-described approaches (9)

Luzzone dam

hiking · Grade unconfirmed · glacier assessment unknown

Ghirone via Luzzone

hiking · Grade unconfirmed · glacier assessment unknown

Vrin

hiking · Grade unconfirmed · glacier assessment unknown

Ghirone via Camadra

hiking · Grade unconfirmed · glacier assessment unknown

Garzott

hiking · Grade unconfirmed · glacier assessment unknown

Pian Geirètt

hiking · Grade unconfirmed · glacier assessment unknown

Von Vrin oder Sogn Giusep

ski touring · WS+ · glacier assessment unknown

Source ascent: 5 h

Von Ghirone-Cozzera

ski touring · ZS- · glacier assessment unknown

Source ascent: 5 h

winter Val Camadra

ski touring · Grade unconfirmed · glacier assessment unknown

Source ascent: 5 h–6 h

Original grade scales are retained. Mountain hiking, mountaineering and ski touring grades describe different skills. Times belong to their published direction and variant.

Onward options

These are published route descriptions. Only a separately qualified mapped connection can be used for planning; proximity between huts does not establish a walking route.

To Camona da Medel

hiking · Grade to confirm

Glacier assessment unknown. Reference only; no qualified connection offered here.

Source reference time: 6 h

To Läntahütte

hiking · Grade to confirm

Glacier assessment unknown. Reference only; no qualified connection offered here.

Source reference time: 7 h

To Capanna Terri

hiking · Grade to confirm

Glacier assessment unknown. Reference only; no qualified connection offered here.

Source reference time: 2 h 30 min

More onward descriptions (6)

To Capanna Adula UTOE
hiking · Grade to confirm · reference only.

Source reference time: 6 h

To Capanna Scaletta
hiking · Grade to confirm · reference only.

Source reference time: 2 h

To Capanna Bovarina
hiking · Grade to confirm · reference only.

Source reference time: 5 h

To Capanna Adula CAS
hiking · Grade to confirm · reference only.

Source reference time: 5 h

To Rifugio Scaradra
hiking · Grade to confirm · reference only.

Source reference time: 3 h

Capanna Scaletta SAT: Etappe 8 Via Alta Crio: Capanna Motterascio – Capanna Scaletta
hiking · T2 · reference only.

Source ascent: 2 h 30 min

Opening & staying

Confirm your dates and reservation with the hut. Published opening periods and usual month patterns do not show available beds or current path conditions.

Hut opening & reservation information ↗
Dated notices, services & travel

Bedding: duvets

Water: not guaranteed; terrace fountain may freeze, otherwise melt snow

Source read 2026-10-24· Motterascio — location, ordinary facilities and winter-room requirements ↗

Bedding: duvets; sleeping liner obligatory, available to rent or buy

Dogs: not inside hut; sheltered woodshed with blanket and bowls, dog sleeps unaccompanied; notify in advance

Water: operator describes spring water as potable during staffed operation, subject to natural supply

Source read 2026-10-24· Motterascio — bedding, dietary requests, water, power and dogs ↗

Notice: Hut is closed for winter after summer 2026. Winter room available from 16 October 2026; no running water or winter toilet. Staffed reopening planned for 12 June 2027.

Source read 2026-10-24· Michela Motterascio — 2026 closure, winter-room opening and planned 2027 reopening ↗

Booking method: online system for winter-room stays and summer 2027

Source read 2026-10-24· Michela Motterascio — 2026 closure, winter-room opening and planned 2027 reopening ↗

Notice: Bus to Ghirone Aquilesco; source describes alpine bus to Luzzone or Pian Geirètt daily July/August and weekends September, without a specific timetable year. Limited Garzott parking; dam parking offers longer walking approach.

Source read 2026-10-24· Motterascio — summer approach choices, onward huts and distinct winter hazards ↗

Unstaffed room: reservation obligatory through online system; confirmation gives access information

Source read 2026-10-24· Motterascio — location, ordinary facilities and winter-room requirements ↗
Sources & what has been checked

Association profile: complete. Operator notices: complete. These checks do not rate the paths around the hut.

Location: OpenStreetMap. Source facts and map locations retain their own provenance.