Skip to content

Malaysia Ultra-Trail by UTMB · crew sheet

Crew sheet: Malaysia Ultra-Trail by UTMB MY100

For a 27h 26 finish (no target in the link: the plan’s Central scenario, half of the finishers faster), starting 03:00 on Sat, 4 Sept 2027, with 3 min at each station. Arrival windows run from 10 % faster to 10 % slower than that: a plan to meet the runner by, not a prediction.

Organizer details and unresolved facts
  • The legs add up to 6151 m, as the page's course table does (6143 m); its headline gives 4802 m.

Where to meet the runner

Crew points with the runner's arrival window, the cutoff and the margin
Crew pointArrivesCutoffMargin
Spritzer Ecoparkkm 37.5Sat 12:09Sat 11:14–Sat 13:04——
Changkat Ibol Junctionkm 62.6 · drop bagSat 17:28Sat 16:01–Sat 18:55Sat 23:005h 32
Finishkm 99.2 · drop bag · finishSun 06:26Sun 03:41–Sun 09:11Sun 11:004h 34

Drop bags: Changkat Ibol Junction (km 62.6, about Sat 17:28); Finish (km 99.2, about Sun 06:26).

Legs run in the dark, wholly or partly: the legs into Angkasa (km 12.5); Maxwell Basecamp (km 22.1); Peak 300; Angkasa (km 86.4); Maxwell Basecamp (km 95.9); Finish. Bring a light and a warm layer to these points.

Crew points and cutoffs from the organizer's page, checked 2026-10-06. Times by the pace plan's model, slowing through the race as finishers do (spread by the organizer's leg climbs). Access, roads, parking and transport are set by the organizer: read their crew information before you travel; some points are reached only on foot, by lift or by train. Directions are shown only where we have the station's position.