Malaysia Ultra-Trail by UTMB · crew sheet
Crew sheet: Malaysia Ultra-Trail by UTMB MY100
For a 27h 26 finish (no target in the link: the plan’s Central scenario, half of the finishers faster), starting 03:00 on Sat, 4 Sept 2027, with 3 min at each station. Arrival windows run from 10 % faster to 10 % slower than that: a plan to meet the runner by, not a prediction.
Organizer details and unresolved facts
- The legs add up to 6151 m, as the page's course table does (6143 m); its headline gives 4802 m.
Where to meet the runner
| Crew point | Arrives | Cutoff | Margin |
|---|---|---|---|
| Spritzer Ecoparkkm 37.5 | Sat 12:09Sat 11:14–Sat 13:04 | — | — |
| Changkat Ibol Junctionkm 62.6 · drop bag | Sat 17:28Sat 16:01–Sat 18:55 | Sat 23:00 | 5h 32 |
| Finishkm 99.2 · drop bag · finish | Sun 06:26Sun 03:41–Sun 09:11 | Sun 11:00 | 4h 34 |
Drop bags: Changkat Ibol Junction (km 62.6, about Sat 17:28); Finish (km 99.2, about Sun 06:26).
Legs run in the dark, wholly or partly: the legs into Angkasa (km 12.5); Maxwell Basecamp (km 22.1); Peak 300; Angkasa (km 86.4); Maxwell Basecamp (km 95.9); Finish. Bring a light and a warm layer to these points.
Crew points and cutoffs from the organizer's page, checked 2026-10-06. Times by the pace plan's model, slowing through the race as finishers do (spread by the organizer's leg climbs). Access, roads, parking and transport are set by the organizer: read their crew information before you travel; some points are reached only on foot, by lift or by train. Directions are shown only where we have the station's position.