Skip to content

Race season planner

Do your races work together? Every verdict comes from the course facts and from how much of one race's preparation carries over to the next. Nothing is saved unless you keep it in your account: your season lives in this page's address.

Check in before the next block

Future blocks are provisional. Report a recent completed seven-day week and how recovery feels before starting one, or after a break. Planned sessions are never proof that you completed them.

When to check in
  • 22 Feb 2027 · Kagaspa Trail Endurance 100 by UTMB. Report completed training at the handover.

Your calendar includes these reminders. They do not automatically change a saved plan.

Your running: 45 km/week · 22 km longest · 5 days · mixed terrain · some experience

Running time estimated from distance; add completed time for a better starting point · completed-week date unknown. Running time excludes strength.

Suggest starting information from my imported runs

Read your last six complete calendar weeks. Choose a representative week and confirm that all its runs were imported. This suggests completed time, distance and known climbing/descending; it cannot infer recovery, exercise familiarity or future availability.

Your race fits the calendar. Preparation still needs confirming from completed training.

Nov 26 Jan 27FebMarAprMayJunJulAug
off-season basebuildingtaperracerecovery
Not building
33%
Longest build
14 wk
Racing descent
2.6k m
Off-season
14 wk

Kagaspa Trail Endurance 100 by UTMB KAGASPA 50K

Calendar fits

· 57 km, +2,607 m · 8–11.2 h on your feet · 4 wk easy running after

46 m of climb per km — a hiking-and-running day; only the front of the field runs the climbs.

Course, cutoffs and race-day guide · Training volume does not certify the technical alpine skills, self-support or intermediate cutoffs this race asks for: check them on the race page.

Future block — preparation still needs confirming

Reassess from completed training at the 2027-02-22 handover. Planned workouts and earlier races do not prove that you completed or recovered from them.

Course demands and preparation still to confirm

Course: 56.7 km; 2607 m climbing; 2620 m descending. Published finish cutoff: 14 hours; confirm the edition and intermediate checkpoints on the race guide. A finish-time margin has not been established.

Reported completed running: time unknown; longest outing time unknown with date unknown. Week ending unknown; weekly climbing unknown, descending unknown. These are starting evidence, not completed future training.

A finish goal needs course preparation and cutoff margin. A performance goal additionally needs demonstrated current fitness; this season does not infer it from planned volume.

Before relying on this block, confirm a recent dated completed week; completed running and longest-outing time with its date; recent climbing, descending and downhill familiarity. If preparation or available time falls short, choose a shorter course or later goal.

There is time for a full build before this one.

The 16 weeks before it — a full build Enough

the dark row marks weeks with real climbing in them

14 wk building for this race
13.5 wk is a full build for you (shorter than the generic 16 weeks because you already run 45 km a week, well above the 25 km this distance assumes)
2 wk tapering, racing or recovering — building nothing
weeks with climbing: 14, the number this course asks for · descent work: 14 weeks, enough

Your training

39 weeks, starting this week
Starting point and future weeks

Future weeks depend on training actually completed and normal recovery. Check your recent running and terrain exposure again when the next race block approaches.

  • Time may be inferred from distance. Future weeks are conditional; update completed running, terrain and recovery at block handovers.

Calendar

Choose a subscription that refreshes, or download a one-time copy.

Keep this season in your account

Then one calendar follows every change you save to your settings, a pause included, and the season opens on your other devices. Without an account the season is this address: its calendar follows race dates, but a change to your settings needs a new link.

This week · Building base

Between blocks the season runs our general Evergreen plan, built from the weekly volume and days you entered. You do not need to have used it before.

5h 5m of running

  • Tue Introductory controlled efforts 45m · Follow the ordered effort steps; shorten or stop if form or recovery deteriorates.
  • Wed Full-body strength (bodyweight) 30m · Moderate: controlled reps, leave 3–4 in reserve
  • Thu Easy run + strides 50m · Easy running with short, fast but relaxed strides; no straining.
  • Fri Easy run 45m · Easy and conversational throughout.
  • Sat Long run 2h · Easy and conversational throughout.
  • Sun Easy run 45m · Easy and conversational throughout.

Next week: Building base · 5h 15m

One coherent season: each demanding race gets its own build, taper and recovery; shorter races are placed inside a build. Recovery spacing and carry-over are reviewed product conventions calibrated against our reference plans, not physiological measurements. Planning guidance from course facts and your stated training — not medical or coaching advice. Recovery spacing, how much preparation carries over, and how many climbing weeks a course asks for are our own reviewed conventions — inspectable, and not measurements of your physiology.