Race season planner

Do your races work together? Every verdict comes from the course facts and from how much of one race's preparation carries over to the next. Nothing is saved unless you keep it in your account: your season lives in this page's address.

Your running: 45 km/week · 22 km longest · 5 days · mixed terrain · some experience

0 of 1 races have the preparation they need. Mallorca by UTMB 20K is the one to look at.

Sep 26 NovDec
off-season basebuildingtaperracerecovery
Not building
63%
Longest build
3 wk
Racing descent
1.3k m
Off-season
4 wk

Mallorca by UTMB 20K

Not doable

· 26 km, +1,000 m · 3–4.2 h on your feet · 3 wk easy running after

38 m of climb per km — steep enough that most runners hike the longer climbs.

Course, cutoffs and race-day guide

Only 4 weeks before it, where your build needs 9 (the generic figure is 12).

What would change this: tick “keep a weekly climb” below, so the earlier block builds the terrain this race needs; or if you have raced this distance before, say so under “your running” — an experienced runner needs a shorter build than the generic one; or a higher current weekly volume shortens the build this race needs; or a shorter distance at the same event, or a later edition.

The 12 weeks before it — a full build Not enough

the dark row marks weeks with real climbing in them

3 wk building for this race
9 wk is a full build for you (shorter than the generic 12 weeks because you run 45 km a week, far above the 18 km this distance assumes)
1 wk tapering, racing or recovering — building nothing
climbing weeks: 3 of the 4 this course asks for

Your training

12 weeks, starting this week

Calendar

Choose a subscription that refreshes, or download a one-time copy.

Keep this season in your account

Then one calendar follows every change you save to your settings, a pause included, and the season opens on your other devices. Without an account the season is this address: its calendar follows race dates, but a change to your settings needs a new link.

This week · Mallorca by UTMB 20K — base building 1 of 3

5h of running · 275 m of climbing

  • Tue Easy hills + uphill strides 50m +100 m · Easy; strides strong but relaxed
  • Tue Strength (optional) 30m · Moderate: controlled reps, stop 1–2 short of failure
  • Wed Easy run 45m · Easy
  • Fri Easy run 45m · Easy
  • Sat Long run 2h +150 m · Easy
  • Sun Recovery run or hike 40m +25 m · Very easy

Next week: Mallorca by UTMB 20K — vert accumulation 2 of 3 · 5h 20m

What you could change

In the order most runners prefer: keep the trip if you can, drop the race last.

  • keep stimulus Keep one weekly climbing session, and controlled descents, through the earlier block so Mallorca by UTMB 20K inherits the terrain work instead of starting from zero.
  • change distance Take a shorter distance at the same event as Mallorca by UTMB 20K. It keeps the trip and the entry, and a shorter race costs less recovery while transferring nearly as much preparation.
  • move or replace Look for a similar race later in the window, so Mallorca by UTMB 20K's preparation has the weeks it needs. Find alternatives →
  • drop Leave Mallorca by UTMB 20K for next season.

One coherent season: each demanding race gets its own build, taper and recovery; shorter races are placed inside a build. Recovery spacing and carry-over are reviewed product conventions calibrated against our reference plans, not physiological measurements. Planning guidance from course facts and your stated training — not medical or coaching advice. Recovery spacing, how much preparation carries over, and how many climbing weeks a course asks for are our own reviewed conventions — inspectable, and not measurements of your physiology.