Skip to content

Drumul Maramureșului: Baia Mare to Târgu Lăpuș

The Drumul Maramureșului is a loop of over 700 km round Maramureș; this guide covers its first 29 legs, from Baia Mare over the hills to Săpânța, along the Tisa and up the Vișeu valley to Vișeu de Sus, village to village by Botiza, Bârsana, Ocna Șugatag and Breb, and over the mountains to Târgu Lăpuș.

Compare with others
452 kmMapped distance
10,200 mMapped ascent
27Walking stages

Best season: May to October. The association gives no season. Its travel guide asks walkers to check the weather and walk in daylight. May to October is the best time in our weather record (below); snow is likely from December to February, above all on stages 2 and 23 over the hills. The Mocănița steam train at Vișeu de Sus runs daily from April to October in 2026. Before you go

Loading your plan…

Plan your days

Your dates

Checking the seasons, closures and current conditions for today…

Twenty-seven stages, cut at the association's leg ends, from 4 to 49 km; many are half-day legs, so the plans join them into days of up to about 8 hours. One day stays longer: stage 2, Blidari to Săpânța, about 47 km and 12 hours over the hills, because no stay we could place splits it; take a tent and camp on the way, or plan a very long day. Stage 23, Budești to Ungureni, splits at Cabana GEO. Many villages have no stay we could place: book ahead by phone, or ask in the village. Choose a plan, or pick your own start, finish and nights below.

20-day plan

  • Routed by TrailSplits
Loading topographic map…
500m1,000m1,500m0100 km200 km300 km400 km452.4 km1,487m227m
Flat (<5%)
Each day in its own colour, numbered where it starts; the rest of the Drumul Maramureșului: Baia Mare to Târgu Lăpuș in grey. Select a day for its elevation and 3D flyover.

Make your own plan

Changing where you stay suggests a new number of days: the fewest that keep each day under 8 h of walking and in daylight, where a place to stay allows.

Choose your nights (19 nights)

Days end where the route has a stay, a camp or a village.

Day by day

  1. Day 1

    Baia Mare to Blidari

    Stage 1

    Distance
    20.1 km
    Climb
    +778 / −558 m
    Walking
    5 h 32measured on the mapped line

    Stage 1: Leg 1, from Baia Mare up to Lac Firiza and Blidari, by the Firiza reservoir: 25 km and a day, the association says; 20.1 km on our line.

    Blidari Town or village

    Leg 1 ends at Lac Firiza and Blidari, by the Firiza reservoir. We could not place a stay here from the association's list of partner stays: ask in the village, or camp (the association's guide says wild camping is allowed along the route). The next stage is the longest of the trail: about 47 km over the hills to Săpânța.

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 1 GPX Open in Planner

  2. Day 2

    Blidari to Săpânța

    Stage 2

    Distance
    47.2 km
    Climb
    +1,160 / −1,348 m
    Walking
    12 h 07measured on the mapped line

    A very long day. Check you can keep this pace on rough ground.

    Stage 2: Legs 2 and 3 in one stage, Blidari to Săpânța: 20 km and 29 km, a day each, the association says (49 km); 47.2 km on our line, about 12 hours of walking with more than 1,100 m of climb, most of it high on the hills. Leg 2 ends at Poiana lui Dumitru, a place OpenStreetMap does not map, so we cannot cut the stage there, and we could not place a stay on the way. Plan two days with a tent (the association's guide says wild camping is allowed along the route), or one very long day.

    Săpânța Town or village

    The end of leg 3, in the village of Săpânța near the Tisa. We could not place a stay here from the association's list of partner stays: ask in the village, or camp (the association's guide says wild camping is allowed along the route).

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 2 GPX Open in Planner

  3. Day 3

    Săpânța to Sighetu Marmației

    Stage 3, Stage 4

    Distance
    19.3 km
    Climb
    +56 / −45 m
    Walking
    4 h 26measured on the mapped line

    Stage 3: Leg 4, Săpânța to Sarasău: 13 km and half a day; 11.6 km on our line. The Tisa here is the border with Ukraine: the halts and stations across the river are in Ukraine, not a way in or out.

    Stage 4: Leg 5, Sarasău to Sighetu Marmației: 10 km and half a day; 7.6 km on our line. Sighet is the main town of the area, with a railway station.

    Sighetu Marmației Town or village

    The main town of the area and the end of leg 5, with shops and a railway station. We could not place a stay here from the association's list.

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 3 GPX Open in Planner

  4. Day 4

    Sighetu Marmației to Lunca la Tisa

    Stage 5

    Distance
    15.4 km
    Climb
    +68 / −25 m
    Walking
    3 h 34measured on the mapped line

    Stage 5: Leg 6, along the Tisa to Lunca la Tisa: 19 km and a day; 15.4 km on our line. The far bank of the river is Ukraine.

    Lunca la Tisa Town or village

    A village on the Tisa, the end of leg 6, with a railway station in OpenStreetMap; check trains on the CFR timetable. We could not place a stay here from the association's list of partner stays: ask in the village, or camp (the association's guide says wild camping is allowed along the route).

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 4 GPX Open in Planner

  5. Day 5

    Lunca la Tisa to Petrova

    Stage 6, Stage 7

    Distance
    27.5 km
    Climb
    +474 / −424 m
    Walking
    7 h 03measured on the mapped line

    Stage 6: Leg 7, to Valea Vișeului: 16 km and a day; 15.6 km on our line. The stage ends about 0.6 km from the village centre.

    Stage 7: Leg 8, by Bistra to Petrova: 18 km and a day; 11.9 km on our line, 6 km less than the association says. The stage ends about 0.35 km from the village centre.

    Overnight

    Camping și Pensiune Dacii Liberi

    Camping spot

    Pick a date to check the season.

    Season
    2026 2026 dates not published No season on the association's listing: ask when you book. drumulmaramuresului.ro, read 13 October 2026
    Places
    Number of places not published A campsite with 24 pitches for tents and caravans, with electricity, drinking water and showers, and guesthouse rooms.
    Booking
    Booking method not published Book with the host by phone: the number is on the association's listing page. There is no online booking on the trail's site.

    The end of leg 8, about 0.35 km from the village centre. The campsite and guesthouse Dacii Liberi is on the line about 1.2 km on, towards Ruscova.

    Or a room in the village. Find your own accommodation; TrailSplits has not checked what is open.

    Day 5 GPX Open in Planner

  6. Day 6

    Petrova to Poienile de sub Munte

    Stage 8, Stage 9

    Distance
    24.0 km
    Climb
    +373 / −213 m
    Walking
    5 h 51measured on the mapped line

    Stage 8: Leg 9, to Ruscova: 13 km and half a day; 10 km on our line. About 1.2 km in, the line passes the campsite and guesthouse Dacii Liberi. The stage ends about 0.4 km from the village centre.

    Stage 9: Leg 10, to Poienile de sub Munte: 17 km and half a day; 14 km on our line.

    Poienile de sub Munte Town or village

    The end of leg 10. We could not place a stay here from the association's list of partner stays: ask in the village, or camp (the association's guide says wild camping is allowed along the route).

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 6 GPX Open in Planner

  7. Day 7

    Poienile de sub Munte to Vișeu de Sus

    Stage 10

    Distance
    20.9 km
    Climb
    +521 / −554 m
    Walking
    5 h 34measured on the mapped line

    Stage 10: Leg 11, to Vișeu de Sus: 24 km and a day; 20.9 km on our line. The stage ends by the station of the Mocănița steam train, about 0.5 km from the town centre.

    Overnight

    Casa Chira

    Hotel

    Pick a date to check the season.

    Season
    2026 2026 dates not published No season on the association's listing: ask when you book. drumulmaramuresului.ro, read 13 October 2026
    Booking
    Booking method not published Book with the host by phone: the number is on the association's listing page. There is no online booking on the trail's site.
    Contact
    Not published

    The town at the end of leg 11. The stage ends by the station of the Mocănița, the steam train up the Vaser valley, about 0.5 km from the town centre. Casa Chira, a guesthouse on the association's list, is about 1.3 km away.

    Or a room in the village. Find your own accommodation; TrailSplits has not checked what is open.

    Day 7 GPX Open in Planner

  8. Day 8

    Vișeu de Sus to Moisei

    Stage 11

    Distance
    17.3 km
    Climb
    +855 / −781 m
    Walking
    5 h 33measured on the mapped line

    Stage 11: Leg 12, to Moisei: 21 km and a day; 17.3 km on our line.

    Moisei Town or village

    The end of leg 12. The association lists two houses with rooms in and near Moisei that we could not place: ask in the village.

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 8 GPX Open in Planner

  9. Day 9

    Moisei to Săcel

    Stage 12

    Distance
    27.2 km
    Climb
    +1,039 / −1,051 m
    Walking
    7 h 29measured on the mapped line

    km 27.1–27.2: Joined by our routing here; the waymarked route may differ.

    Stage 12: Leg 13, Moisei to Săcel: 33 km, "one to two days", the association says; 27.2 km on our line, about 7 h 30 of walking. The association's 80 km Borșa variant (13.1) is not on our line. At Săcel the last 149 m, on the DN17C, are not part of the mapped route: joined by our routing here; the waymarked route may differ. The stage ends about 0.8 km from the village centre.

    Săcel Town or village

    The end of leg 13, about 0.8 km from the village centre; the last 149 m into the village, on the DN17C, are joined by our routing. We could not place a stay here from the association's list of partner stays: ask in the village, or camp (the association's guide says wild camping is allowed along the route).

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 9 GPX Open in Planner

  10. Day 10

    Săcel to Dragomirești

    Stage 13, Stage 14

    Distance
    23.2 km
    Climb
    +494 / −615 m
    Walking
    5 h 42measured on the mapped line

    Stage 13: Leg 14, to Săliștea de Sus: 22 km and a day; 16.7 km on our line.

    Stage 14: Leg 15, to Dragomirești: 9 km and half a day; 6.5 km on our line.

    Dragomirești Town or village

    The end of leg 15. We could not place a stay here from the association's list of partner stays: ask in the village, or camp (the association's guide says wild camping is allowed along the route).

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 10 GPX Open in Planner

  11. Day 11

    Dragomirești to Botiza

    Stage 15, Stage 16

    Distance
    23.3 km
    Climb
    +422 / −377 m
    Walking
    5 h 42measured on the mapped line

    Stage 15: Leg 16, to Bogdan Vodă: 9 km and half a day; 6.7 km on our line.

    Stage 16: Leg 17, to Botiza: 20 km and a day; 16.6 km on our line.

    Botiza Town or village

    The end of leg 17. We could not place a stay here from the association's list of partner stays: ask in the village, or camp (the association's guide says wild camping is allowed along the route).

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 11 GPX Open in Planner

  12. Day 12

    Botiza to Bârsana

    Stage 17, Stage 18

    Distance
    22.6 km
    Climb
    +289 / −448 m
    Walking
    5 h 21measured on the mapped line

    Stage 17: Leg 18, to Glod: 11 km and half a day; 10.5 km on our line.

    Stage 18: Leg 19, to Bârsana: 11 km and half a day; 12.1 km on our line. The line passes through the lower part of the long village and the stage ends there, about 1.7 km from its centre.

    Overnight

    Camping Bradova

    Camping spot

    Pick a date to check the season.

    Season
    2026 2026 dates not published No season on the association's listing: ask when you book. drumulmaramuresului.ro, read 13 October 2026
    Places
    Number of places not published Tent and caravan pitches (the number is not given) and a restaurant.
    Booking
    Booking method not published Book with the host by phone: the number is on the association's listing page. There is no online booking on the trail's site.

    The end of leg 19. The line passes through the lower part of the long village, about 1.7 km from its centre, and the stage ends there. Camping Bradova, on the association's list, is about 4 km north of the stage end.

    Or a room in the village. Find your own accommodation; TrailSplits has not checked what is open.

    Day 12 GPX Open in Planner

  13. Day 13

    Bârsana to Ocna Șugatag

    Stage 19

    Distance
    19.2 km
    Climb
    +459 / −295 m
    Walking
    4 h 49measured on the mapped line

    Stage 19: Leg 20, to Ocna Șugatag: 23 km and a day; 19.2 km on our line.

    Ocna Șugatag Town or village

    The end of leg 20. We could not place a stay here from the association's list of partner stays: ask in the village, or camp (the association's guide says wild camping is allowed along the route).

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 13 GPX Open in Planner

  14. Day 14

    Ocna Șugatag to Mara

    Stage 20

    Distance
    14.0 km
    Climb
    +278 / −309 m
    Walking
    3 h 45measured on the mapped line

    Stage 20: Leg 21, by Desești to Mara: 17 km and half a day; 14 km on our line.

    Overnight

    Piscina pă Coastă și Păstrăvăria Alex

    Hotel

    Pick a date to check the season.

    Season
    2026 2026 dates not published No season on the association's listing: ask when you book. drumulmaramuresului.ro, read 13 October 2026
    Booking
    Booking method not published Book with the host by phone: the number is on the association's listing page. There is no online booking on the trail's site.
    Contact
    Not published

    The end of leg 21. Păstrăvăria Alex, a trout farm with a pool and rooms on the association's list, is about 1.3 km from the stage end.

    Or a room in the village. Find your own accommodation; TrailSplits has not checked what is open.

    Day 14 GPX Open in Planner

  15. Day 15

    Mara to Breb

    Stage 21

    Distance
    16.4 km
    Climb
    +624 / −561 m
    Walking
    4 h 27measured on the mapped line

    Stage 21: Leg 22, to Breb: 16 km and half a day; 16.4 km on our line. The stage ends about 0.5 km from the village centre.

    Overnight

    Casa Măriuca

    Hotel

    Pick a date to check the season.

    Season
    2026 2026 dates not published No season on the association's listing: ask when you book. drumulmaramuresului.ro, read 13 October 2026
    Booking
    Booking method not published Book with the host by phone: the number is on the association's listing page. There is no online booking on the trail's site.
    Contact
    Not published

    Overnight

    Casa din Vale

    Hotel

    Pick a date to check the season.

    Season
    2026 2026 dates not published No season on the association's listing: ask when you book. drumulmaramuresului.ro, read 13 October 2026
    Booking
    Booking method not published Book with the host by phone: the number is on the association's listing page. There is no online booking on the trail's site.
    Contact
    Not published

    The end of leg 22, about 0.5 km from the village centre, and the best-served village on this part of the trail. Casa Măriuca is about 0.4 km from the stage end; Casa din Vale is by the line about 1.3 km before it.

    Or a room in the village. Find your own accommodation; TrailSplits has not checked what is open.

    Day 15 GPX Open in Planner

  16. Day 16

    Breb to Cabana GEO

    Stage 22, Stage 23 (part)

    Distance
    24.3 km
    Climb
    +1,088 / −542 m
    Walking
    6 h 58measured on the mapped line

    Stage 22: Leg 23, to Budești: 8 km and half a day; 4 km on our line, half the association's figure.

    Stage 23 begins here; its notes are with Day 17, which walks most of it.

    Overnight

    Cabana GEO

    Hotel

    Pick a date to check the season.

    Season
    2026 2026 dates not published No season on the association's listing: ask when you book. drumulmaramuresului.ro, read 13 October 2026
    Places
    13 places in total 5 rooms with their own bathrooms (3 triple, 2 double), for up to 13 adults and 4 children.
    Booking
    Booking method not published Book with the host by phone: the number is on the association's listing page. There is no online booking on the trail's site.
    Contact
    Not published

    Not a stage end: Cabana GEO, a chalet on the association's list, about 20 km in, where the long stage over the mountains can be split.

    Day 16 GPX Open in Planner

  17. Day 17

    Cabana GEO to Ungureni

    Stage 23 (part)

    Distance
    28.4 km
    Climb
    +625 / −1,316 m
    Walking
    6 h 44measured on the mapped line

    Stage 23, of which this day walks part: Legs 24 and 25 in one stage, Budești to Ungureni: 23 km to Cavnic and 24 km on to Ungureni, a day each, the association says (47 km); 48.7 km on our line, nearly 13 hours of walking with well over 1,000 m of climb. The mapped route crosses the Rotunda pass and passes about 2.9 km from Cavnic, where leg 24 ends, so we cannot cut the stage there. Cabana GEO, a chalet on the association's list, is by the line about 20 km in: stay there to walk the stage in two days of about 7 hours each.

    Ungureni Town or village

    The end of leg 25. We could not place a stay here from the association's list of partner stays: ask in the village, or camp (the association's guide says wild camping is allowed along the route).

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 17 GPX Open in Planner

  18. Day 18

    Ungureni to Groșii Țibleșului

    Stage 24

    Distance
    17.6 km
    Climb
    +323 / −223 m
    Walking
    4 h 27measured on the mapped line

    Stage 24: Leg 26, to Groșii Țibleșului: 23 km and a day; 17.6 km on our line.

    Groșii Țibleșului Town or village

    The end of leg 26. We could not place a stay here from the association's list of partner stays: ask in the village, or camp (the association's guide says wild camping is allowed along the route).

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 18 GPX Open in Planner

  19. Day 19

    Groșii Țibleșului to Rogoz

    Stage 25, Stage 26

    Distance
    20.1 km
    Climb
    +65 / −201 m
    Walking
    4 h 34measured on the mapped line

    Stage 25: Leg 27, to Suciu de Sus: 10 km and half a day; 8.7 km on our line.

    Stage 26: Leg 28, to Rogoz: 13 km and half a day; 11.5 km on our line.

    Rogoz Town or village

    The end of leg 28. We could not place a stay here from the association's list of partner stays: ask in the village, or camp (the association's guide says wild camping is allowed along the route).

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 19 GPX Open in Planner

  20. Day 20

    Rogoz to Târgu Lăpuș

    Stage 27

    Distance
    24.4 km
    Climb
    +209 / −226 m
    Walking
    5 h 42measured on the mapped line

    Stage 27: Leg 29, to Târgu Lăpuș: 27 km and a day; 24.4 km on our line. This guide ends here: the association's legs 30 to 41 go on by Rohia, Coaș and Chechiș back to Baia Mare and are not on our line.

    Day 20 GPX Open in Planner

Longest day: day 2, 12 h 07.

How these plans are made

Days end at a stage end with a refuge or a village, or in a village the route passes through. Walking times are measured on each stage's mapped line by our route analysis (terrain heights and our hiking-time model, moving time only): no time is published for these stages.Outside Switzerland our walking times often run short of the times route operators publish; treat them as optimistic. Running times use 7.5 km/h plus one hour per 700 m of climb: a steady reference, not a prediction. Daylight is sunrise to sunset where the day starts; the time left is for breaks, meals and delays.Refuge dates come from the operator's own pages; when they are not published, we say so. For villages we count the places to stay OpenStreetMap lists; we have not checked which are open. A plan is not a booking: reserve every night before you commit to these day lengths.

Huts and stays, stage by stage

Where each stage ends, the 2026 and 2027 seasons the operator publishes, and how to book. Read from the operators' pages on 13 October 2026; each stage page shows the sources and the grade profile.

StageNight at20262027Booking
1. Baia Mare to BlidariBlidari · accommodation in town, not checkedEach host has its own seasonBook with a host
2. Blidari to SăpânțaSăpânța · accommodation in town, not checkedEach host has its own seasonBook with a host
3. Săpânța to SarasăuSarasău · accommodation in town, not checkedEach host has its own seasonBook with a host
4. Sarasău to Sighetu MarmațieiSighetu Marmației · accommodation in town, not checkedEach host has its own seasonBook with a host
5. Sighetu Marmației to Lunca la TisaLunca la Tisa · accommodation in town, not checkedEach host has its own seasonBook with a host
6. Lunca la Tisa to Valea VișeuluiValea Vișeului · accommodation in town, not checkedEach host has its own seasonBook with a host
7. Valea Vișeului to PetrovaCamping și Pensiune Dacii Liberi 2026 dates not publishednot publishedBooking method not published
8. Petrova to RuscovaRuscova · accommodation in town, not checkedEach host has its own seasonBook with a host
9. Ruscova to Poienile de sub MuntePoienile de sub Munte · accommodation in town, not checkedEach host has its own seasonBook with a host
10. Poienile de sub Munte to Vișeu de SusCasa Chira 2026 dates not publishednot publishedBooking method not published
11. Vișeu de Sus to MoiseiMoisei · accommodation in town, not checkedEach host has its own seasonBook with a host
12. Moisei to SăcelSăcel · accommodation in town, not checkedEach host has its own seasonBook with a host
13. Săcel to Săliștea de SusSăliștea de Sus · accommodation in town, not checkedEach host has its own seasonBook with a host
14. Săliștea de Sus to DragomireștiDragomirești · accommodation in town, not checkedEach host has its own seasonBook with a host
15. Dragomirești to Bogdan VodăBogdan Vodă · accommodation in town, not checkedEach host has its own seasonBook with a host
16. Bogdan Vodă to BotizaBotiza · accommodation in town, not checkedEach host has its own seasonBook with a host
17. Botiza to GlodGlod · accommodation in town, not checkedEach host has its own seasonBook with a host
18. Glod to BârsanaCamping Bradova 2026 dates not publishednot publishedBooking method not published
19. Bârsana to Ocna ȘugatagOcna Șugatag · accommodation in town, not checkedEach host has its own seasonBook with a host
20. Ocna Șugatag to MaraPiscina pă Coastă și Păstrăvăria Alex 2026 dates not publishednot publishedBooking method not published
21. Mara to BrebCasa Măriuca 2026 dates not publishednot publishedBooking method not published
22. Breb to BudeștiBudești · accommodation in town, not checkedEach host has its own seasonBook with a host
23. Budești to UngureniUngureni · accommodation in town, not checkedEach host has its own seasonBook with a host
24. Ungureni to Groșii ȚibleșuluiGroșii Țibleșului · accommodation in town, not checkedEach host has its own seasonBook with a host
25. Groșii Țibleșului to Suciu de SusSuciu de Sus · accommodation in town, not checkedEach host has its own seasonBook with a host
26. Suciu de Sus to RogozRogoz · accommodation in town, not checkedEach host has its own seasonBook with a host
27. Rogoz to Târgu LăpușTârgu Lăpuș · accommodation in town, not checkedEach host has its own seasonBook with a host

Weather this week

Loading the forecast for low point (174 m) and high point (1,484 m)…

Weather by month

Typical weather on this trail: at the lowest point (174 m) and the highest point (1,484 m). Select a month to see why it is rated as it is.

Monthly climate averages and daylight
Month
WeatherPoorMixedMixedMixedGoodGoodGoodMixedGoodGoodMixedPoor
Stages rated good on typical weather0/270/270/2720/2727/2727/2719/2714/2727/2726/271/270/27
High point, day / night-3°/-10°-2°/-10°1°/-7°7°/-2°12°/2°16°/6°18°/8°18°/8°13°/4°9°/1°3°/-4°-2°/-8°
Low point, day / night2°/-5°5°/-4°11°/0°18°/5°23°/10°26°/13°28°/15°28°/14°23°/10°17°/6°10°/2°4°/-3°
Rain, mm52607267991161239477686463
Snow at high pointLikelyLikelyLikelyLikely–––––PossiblePossibleLikely
Daylight8 h 5010 h 1411 h 4913 h 3415 h 0515 h 5715 h 3814 h 2012 h 3910 h 579 h 218 h 28

Source: TerraClimate 1991–2020 monthly averages. Averages for the area at each point’s elevation (4 km grid, corrected for height). Not a forecast or a report of current trail conditions. Snow at the high point is estimated with a simple snowpack model from these temperatures and precipitation, not observed; steep islands and high summits can hold more snow than it shows. Daylight is for the 15th of each month. Hut, transport and park seasons are separate: check them for your dates.

Before you go

Prepare for the Drumul Maramureșului

Arrange your stays, food and travel first, then check conditions again near departure.

Book each night by phone

There is no central booking. The association lists 42 partner stays (guesthouses, rooms in village houses, chalets and campsites), each booked by phone with the host; the number is on the stay's page on the association's site. Many stage ends have no stay we could place on the map: ask a host before you go, or carry a tent. The association's guide says wild camping is allowed along the route; we have not checked the rules inside the natural parks.

Our line and the official legs

This guide covers the association's legs 1 to 29 of 41, Baia Mare to Târgu Lăpuș: 524 km on its figures, 452.4 km on our line, which runs about 14 % shorter throughout. Legs 30 to 41, back to Baia Mare by Rohia, Coaș and Chechiș, and the variants by Seini and round Borșa are not here. The association publishes a length and a day or half a day for each leg, but no hours (the association's route list, read 13 October 2026).

Asociația Origini Maramureș: the legs (Romanian)

Where to stay

The association lists 42 partner stays round the loop, booked by phone with each host. We placed seven of them on this part of the trail: by Petrova, in Vișeu de Sus, Bârsana, Mara and Breb, and Cabana GEO on stage 23. Elsewhere, ask in the village or camp: the association's guide says wild camping is allowed along the route (the association's partner list, read 13 October 2026).

Asociația Origini Maramureș: partner stays (Romanian)

Two long stages

Stage 2, Blidari to Săpânța, is two legs (20 and 29 km) in one: about 47 km on our line, most of it high on the hills, with no stay we could place. Stage 23, Budești to Ungureni, is legs 24 and 25 (23 and 24 km): about 49 km over the Rotunda pass. Cabana GEO, about 20 km in, splits it; Cavnic, where leg 24 ends, is 2.9 km off our line (the association's route list, read 13 October 2026).

Asociația Origini Maramureș: Cavnic to Ungureni (Romanian)

Along the Tisa

On stages 3 to 6 the trail runs near the Tisa, which is the border with Ukraine. Stations and halts on the far bank are in Ukraine and are not a way in or out. We could not confirm on an official page what the Border Police ask of walkers near the border, here or in the Vaser valley: ask locally.

Asociația Origini Maramureș: travel guide (Romanian)

The Mocănița in Vișeu de Sus

Stage 10 ends by the station of the Mocănița, the narrow-gauge steam train up the Vaser valley to Paltin. It is an out-and-back tourist trip, not transport along the trail. In 2026 it runs daily from April to October, Thursday to Sunday in January, February, November and December, and Friday to Sunday in March (the operator's 2026 timetable, read 13 October 2026).

Mocănița Maramureșului: timetable

Trail news and mountain rescue

The association has no news or closures page; we watch its route list and partner list for changes. Salvamont Maramureș is the county's mountain rescue service; in an emergency call 112 (Salvamont Maramureș announcements, checked 13 October 2026).

Salvamont Maramureș: announcements (Romanian)

Closures and notices last checked 13 October 2026: Asociația Origini Maramureș: partner stays · Mocănița Maramureșului: timetable · Asociația Origini Maramureș: the legs. Check them again before you set out.

Getting there

Connect your journey

Choose a stage or journey above to narrow the travel searches.

Google Maps journey searches, not confirmed services. A mountain endpoint may need a booked transfer or an additional walk.

To the start in Baia Mare

CFR Călători, the national rail operator, runs trains to Baia Mare; its pages show the times after a search. The trail starts near the Stadion bus stop; the association's tourism office is on Piața Libertății in the centre.

CFR Călători: Baia Mare to Sighetu Marmației

On the way

Sighetu Marmației, at the end of stage 4, has a railway station; check CFR's timetable on the day. We found no official timetable for local buses between the villages: ask your host.

Infofer: Sighetu Marmației station

Home from Târgu Lăpuș

This guide ends in Târgu Lăpuș. We found no official bus or train timetable from the town: ask your host how to get back to Baia Mare, or walk on along the association's legs 30 to 41, which are not on our line.

Asociația Origini Maramureș: the legs (Romanian)

Take your trip with you

Offline maps

Prepare each stage while you still have a connection: on the hills of stages 2 and 23 and in the side valleys the signal can be weak.

Keep your route and maps on your phone for places without a signal. For multi-day trips, prepare them in the installed TrailSplits app.

  1. Open this trail in the app. Install TrailSplits, then open this trail there. On iPhone, downloads in a browser may not be available in the installed app.
  2. Choose your route or stages. Choose Prepare offline above. Wait for the route and maps to finish downloading.
  3. Try it before leaving coverage. Switch offline, close and reopen the app, then use My Hikes to start navigation. Repeat for every part you will need.

Saving a bookmark is not a map download. Storage can be cleared by your device; keep a backup map for remote trips.

Drumul Maramureșului: Baia Mare to Târgu Lăpuș — frequently asked questions

How long is the Drumul Maramureșului: Baia Mare to Târgu Lăpuș, and how many days does it take?

Asociația Origini Maramureș gives 702 km for the whole loop in 41 legs; legs 1 to 29, Baia Mare to Târgu Lăpuș, which this guide covers, add up to 524 km on its figures and 452.4 km on our line. Our map has it in 27 sections. The guide's day planner offers a 20-day plan on the overnight stops, and you can choose your own nights.

When is the best time to walk the Drumul Maramureșului: Baia Mare to Târgu Lăpuș?

May to October. The association gives no season.

How do you get to the start of the Drumul Maramureșului: Baia Mare to Târgu Lăpuș, and back?

CFR Călători, the national rail operator, runs trains to Baia Mare; its pages show the times after a search. The "Connect your journey" section has the travel details, with 2 more travel notes.

Do you need to book on the Drumul Maramureșului: Baia Mare to Târgu Lăpuș?

There is no central booking.

Can I download the GPX of the Drumul Maramureșului: Baia Mare to Târgu Lăpuș?

Yes: the route on our map and every section, free, for a GPS watch or a phone. The guide also saves your plan for offline use in the app.

Is the Drumul Maramureșului: Baia Mare to Târgu Lăpuș open? Where are closures announced?

Closures we know of are shown on the days and sections they affect, in the day planner and on the stage pages. We watch 3 official notice pages (Asociația Origini Maramureș: partner stays; Mocănița Maramureșului: timetable; Asociația Origini Maramureș: the legs); the date we last read them is shown with the notices on this page. Check them again before you set off.

Route & sources

Route map & sources

Asociația Origini Maramureș publishes the Drumul Maramureșului as a loop of 41 numbered legs, 702 km from Baia Mare and back ("over 700 km", its site says), plus two variants: 1.1, Seini to Țara Codrului (170 km), and 13.1, round Borșa (80 km). Each leg has a length and a duration of a day or half a day; the association publishes no stage times, and no climb or descent. This guide covers legs 1 to 29, from Baia Mare to Târgu Lăpuș: 524 km on the association's figures. Legs 30 to 41, from Târgu Lăpuș by Rohia, Coaș, Chechiș and Șișești back to Baia Mare, and both variants are not on our line. The line here is the route on OpenStreetMap (relation 13075143, from the planet of 11 October 2026), walked in the association's order: 452.4 km, cut at its leg ends into 27 stages. Our line runs about 14 % shorter than the association's figures throughout, so each stage gives both. Two stages join two legs each, because a leg end is missing from our line: stage 2 is legs 2 and 3 (the association's Poiana lui Dumitru, where leg 2 ends, is not on OpenStreetMap), and stage 23 is legs 24 and 25 (the mapped route crosses the Rotunda pass and passes 2.9 km from Cavnic, where leg 24 ends). At Săcel, 149 m of the DN17C are not part of the mapped route: our routing joins them there. Several stages end outside the village centre; each stage and stop says by how much. Times are measured on our line, and our climb on terrain heights, so short steep steps are smoothed out.

Official guidance and mapped-source comparison checked 13 October 2026. Map data is a route reference, not confirmation of today's path, weather or accommodation availability.

Asociația Origini Maramureș: Drumul Maramureșului legs

Map data © OpenStreetMap contributors · Source relation

Planning ahead?

Checking snow-monitoring coverage... Notifications require permission on this device; on iPhone use the installed Home Screen app. No email alerts are sent.