Skip to content

Race pace

Malaysia Ultra-Trail by UTMB MY50 pace calculator

Sat, 4 September 2027 · 54.5 km · 1977 m D+

Training plan for the MY50

Race-day pacing plan

Set a finish target and stopped-time budget, then use the GPX-derived split table for where the course should feel slow or runnable.

Official cutoff
17h 00
Clock pace
13:24 / km
Finish time including stops.
Moving pace
13:07 / km
What your watch needs while moving.
Effort pace
8:50 / km
Uses climb and descent adjusted distance.
Cutoff buffer
+4h 50
At the selected finish target.
Recorded course figures
54.5 km
1977 m D+ · 1980 m D-
Recorded figures while the course loads.
Adjusted workload
80.9 effort-km
100 m climb = 1 km; 300 m descent = 1 km.
Hardest block
Loading
Split plan will appear below.

Course-aware split plan

Five-kilometer blocks from the GPX, weighted by climb and descent load.

Start 05:00

Open the station plan to include your stops and read the organizer’s details for this course.

Cut-Off & Pacing Calculator

An estimate: each leg is paced by its distance and the height difference between its stations, not the climbs in between.

Set your target finish time and see your projected arrival at each aid station versus the official cut-off.

12h 00m
6h (fast) 17h (cutoff)
Aid StationKmElevSegYour ETACut-offMargin
Start 🎒020m—05:00 ——
Tiger Temple 9.631m9.6 km
2h05
07:05
+2h05
——
Spritzer EcoPark 🚗 17.418m7.8 km
1h41
08:46
+3h46
——
KTM Tunnel 23.123m5.7 km
1h14
10:00
+5h00
——
Changkat Ibol 🚗 35.527m12.4 km
2h40
12:40
+7h40
15:00+2h20
U-turn Kuning Sari 39.727m4.2 km
54min
13:34
+8h34
——
Peak 300 42.2180m2.5 km
48min
14:23
+9h23
——
Finish 🎒54.420m12.2 km
2h37
17:00
+12h00
22:00+5h00

Pacing uses elevation-weighted splits (harder climbs = slower segments). Actual times depend on fitness, conditions, and aid station stops.

Aid Stations — MY50

Start

Km 0 · 20m

Start
💧 Water🍌 Food🏥 Medical 🎒 Drop Bag

Tiger Temple

Km 9.6 · 31m

💧 Water🍌 Food🏥 Medical

Spritzer EcoPark

Km 17.4 · 18m

💧 Water🍌 Food🏥 Medical

KTM Tunnel

Km 23.1 · 23m

💧 Water🍌 Food🏥 Medical

Changkat Ibol

Km 35.5 · 27m

💧 Water🍌 Food🏥 Medical
Cut-off: 15:00 (10h00)

U-turn Kuning Sari

Km 39.7 · 27m

💧 Water🍌 Food🏥 Medical

Peak 300

Km 42.2 · 180m

💧 Water🍌 Food🏥 Medical

Finish

Km 54.4 · 20m

Finish
💧 Water🍌 Food🏥 Medical 🎒 Drop Bag
Arrive by: 22:00 (17h00)
Organizer details and unresolved facts
  • The legs add up to 1762 m, as the page's course table does (1750 m); its headline gives 1977 m.

Crew-accessible stations

Send this page to your crew. The organizer allows crew at these 2 stations: Spritzer EcoPark (km 17.4); Changkat Ibol (km 35.5).

Stations as the organizer published them for 2027, read 6 Oct 2026: organizer's course page. Check it before race day.