Skip to content

Race pace

Ultra Trail Chattanooga by UTMB 100K pace calculator

Sat, 5 June 2027 · 100 km · 2436 m D+

Training plan for the 100K

Race-day pacing plan

Set a finish target and stopped-time budget, then use the GPX-derived split table for where the course should feel slow or runnable.

Official cutoff
18h 00
Clock pace
8:15 / km
Finish time including stops.
Moving pace
7:48 / km
What your watch needs while moving.
Effort pace
5:56 / km
Uses climb and descent adjusted distance.
Cutoff buffer
+4h 15
At the selected finish target.
Recorded course figures
100.0 km
2436 m D+ · 2110 m D-
Recorded figures while the course loads.
Adjusted workload
131.4 effort-km
100 m climb = 1 km; 300 m descent = 1 km.
Hardest block
Loading
Split plan will appear below.

Course-aware split plan

Five-kilometer blocks from the GPX, weighted by climb and descent load.

Start 06:00

Open the station plan to include your stops and read the organizer’s details for this course.

Cut-Off & Pacing Calculator

An estimate: each leg is paced by its distance and the height difference between its stations, not the climbs in between.

Set your target finish time and see your projected arrival at each aid station versus the official cut-off.

14h 00m
7h (fast) 18h (cutoff)
Aid StationKmElevSegYour ETACut-offMargin
Start 🚗 🎒0204m—06:00 ——
Finish 🚗 101.8532m101.8 km
14h00
20:00
+14h00
00:00+4h00

Pacing uses elevation-weighted splits (harder climbs = slower segments). Actual times depend on fitness, conditions, and aid station stops.

Aid Stations — 100K

Start

Km 0 · 204m

Start
🏥 Medical 🎒 Drop Bag

Finish

Km 101.8 · 532m

Finish
💧 Water🍌 Food🏥 Medical
Arrive by: Day 2 00:00 (18h00)
Organizer details and unresolved facts
  • Adding the section figures in the organizer’s table gives 2,083 m of climb and 1,765 m of descent. The whole-course profile totals are 2,070 m and 1,746 m, while the course headline gives 2,436 m of climb. These figures come from different parts of the organizer’s page. The organizer’s complete aid-station chart is still forthcoming; this list contains the start and finish only.

Crew-accessible stations

Send this page to your crew. The organizer allows crew at this station: Finish (km 101.8).

Stations as the organizer published them for 2027, read 13 Oct 2026: organizer's course page. Check it before race day.