Best season: All year, with care in winter. The Las Cañadas stretches reach about 2,400 m: winter nights are near freezing and snow or ice is possible from January to March. The forest and southern stretches are mild all year. Before you go
Plan your days
Most of stretch 1 is closed since the 2023 forest fire, so the plans start at La Caldera, and La Esperanza to Cuatro Tiempos is a day on its own. Places to stay are few: La Caldera and El Portillo by bus to La Orotava, the Parador inside the national park, and Vilaflor.
Make your own plan
No departure date chosen. Add your first day to check stays, dated closures and daylight. Snow conditions describe today.
Changing the pace or where you stay suggests a new number of days: the fewest that keep each day under 8 h of walking and in daylight, where a place to stay allows.
Choose your nights (3 nights)
Days end where the route has a stay, a camp or a village.
Checks for the whole plan. A planned overnight stop is not a booking.
Your dates
Checking the seasons, closures and current conditions for today…
5 h 40Turismo de Tenerife time 5 h 40; measured on the mapped line 5 h 05
Closures at times: km 3.1–3.2 of stage 2. Conservation works with closures at times (Tenerife ON, updated 14 September 2026).
El PortilloStay in or via La Orotava
A visitor centre and restaurants; no accommodation, and camping is not allowed in the national park. TITSA line 348 leaves El Portillo at about 16:30 for La Orotava and Puerto de la Cruz, and comes back up the next morning (09:30 from Puerto de la Cruz, at El Portillo about 10:40); line 342 serves the south coast (titsa.com, lines 348 and 342).
OpenStreetMap lists at least 5 places to stay within about 600 m of La Orotava; TrailSplits has not checked which are open.
5 h 26Turismo de Tenerife times, plus our measured time off the route
Includes 3.6 km off the route by the GR 131.1 to Parador de Las Cañadas del Teide.
Closed on set days 07:00–14:00: km 0–12.8 of stage 3. Closed 07:00–14:00 for mouflon control on Mondays, Tuesdays and Fridays from 2 October to 3 November 2026, and on 14 and 15 December 2026: the national park's Siete Cañadas sector south of the TF-21, except the El Portillo and Parador areas. The GR 131.1 path to the Parador is inside the sector.
Stage 3: This map ends the stretch at the junction with the GR 131.1 to the Parador; the official stretch continues about 1 km up to the Degollada de Guajara pass, which the map adds to the next stretch.
Overnight
Parador de Las Cañadas del Teide
Hotel
Pick a date to check the season.
Season
Not checked
Places
Number of places not published · Restaurant meals The only hotel inside Teide National Park; it has a restaurant.
For the Parador, leave the GR 131 here on the GR 131.1 (about 3.6 km, Cabildo relation 2602966). The official stretch continues about 1 km up to the Degollada de Guajara pass.
6 h 24Turismo de Tenerife times, plus our measured time off the route
Includes 3.6 km from Parador de Las Cañadas del Teide back to the route by the GR 131.1.
Closed on set days 07:00–16:00: km 0–11.4 of stage 4. Closed 07:00–16:00 for mouflon control on 21 and 28 October, on Mondays, Tuesdays, Wednesdays and Fridays from 4 to 18 November, and on 23 and 24 November and 10 December 2026: the GR 131 from Vilaflor to the Degollada de Guajara, named in the notice. The notice calls 10 December a Wednesday, which is the 9th, so keep off both days.
Stage 4: From the GR 131.1 junction the path climbs about 1 km to the Degollada de Guajara pass (about 2,370 m), then descends some 1,000 m to Vilaflor.
VilaflorTown or village
OpenStreetMap lists at least 8 places to stay within about 600 m; TrailSplits has not checked which are open.
Days end at a stage end with a refuge or a village, or in a village the route passes through. Walking times are the times published by webtenerife.co.uk where a stage has one, with the time measured on the mapped line beside it; a day that walks part of a stage gets a share of the stage's time by distance and climb.Outside Switzerland our walking times often run short of the times route operators publish; treat them as optimistic. Running times use 7.5 km/h plus one hour per 700 m of climb: a steady reference, not a prediction. Daylight is sunrise to sunset where the day starts; the time left is for breaks, meals and delays. For villages we count the places to stay OpenStreetMap lists; we have not checked which are open. A plan is not a booking: reserve every night before you commit to these day lengths.
Weather this week
Loading the forecast for low point (624 m) and high point (2,417 m)…
Weather by month
Typical weather on this trail: at the lowest point (624 m) and the highest point (2,417 m). Select a month to see why it is rated as it is.
Monthly climate averages and daylight
Month
Weather
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Stages rated good on typical weather
4/5
4/5
4/5
5/5
5/5
5/5
5/5
4/5
5/5
5/5
5/5
5/5
High point, day / night
8°/1°
9°/0°
11°/1°
13°/2°
16°/4°
20°/8°
24°/11°
24°/11°
20°/8°
15°/6°
11°/3°
9°/2°
Low point, day / night
18°/11°
18°/11°
20°/12°
20°/12°
22°/13°
24°/15°
26°/17°
27°/18°
26°/18°
24°/16°
21°/14°
19°/13°
Rain, mm
56
64
46
27
15
2
1
5
17
45
42
77
Snow at high point
Possible
Possible
Possible
Frost
–
–
–
–
–
–
–
Frost
Daylight
10 h 32
11 h 11
11 h 57
12 h 49
13 h 31
13 h 55
13 h 47
13 h 11
12 h 22
11 h 32
10 h 46
10 h 22
Source: TerraClimate 1991–2020 monthly averages. Averages for the area at each point’s elevation (4 km grid, corrected for height). Not a forecast or a report of current trail conditions. Snow at the high point is estimated with a simple snowpack model from these temperatures and precipitation, not observed; steep islands and high summits can hold more snow than it shows. Daylight is for the 15th of each month. Hut, transport and park seasons are separate: check them for your dates.
Before you go
Prepare for the Teide caldera
Arrange your stays, food and travel first, then check conditions again near departure.
Choose your nights
Five official stretches from La Esperanza to Arona; most of the first is closed since the 2023 fire. Book the Parador first: it is the only hotel inside the national park.
Book the Parador first
The Parador de Las Cañadas del Teide is the only hotel inside the national park, 3.6 km off the route by the GR 131.1. Without it, the caldera stretches need a bus or a taxi to reach a bed.
Las Cañadas lies above 2,000 m: nights near freezing in winter, and snow or ice possible from January to March. Check the forecast and the Cabildo's trail alerts each morning.
The Cabildo shuts parts of the high ground for mouflon culling. Las Cañadas, south of the TF-21 (stretch 3 and the GR 131.1 to the Parador), is closed 07:00–14:00 on Mondays, Tuesdays and Fridays from 2 October to 3 November and on 14 and 15 December. Vilaflor to the Degollada de Guajara (stretch 4) is closed 07:00–16:00 on 21 and 28 October, on Mondays, Tuesdays, Wednesdays and Fridays from 4 to 18 November, and on 23 and 24 November and 9–10 December. Plan those stretches for other days: the day planner flags them on your dates.
The Cabildo's trail map shows km 15.3 to 27.8 of La Esperanza to La Caldera closed since the forest fire of summer 2023 and for rockfall, with no signed way round. Entering a closed section is not allowed. Walk La Esperanza to Cuatro Tiempos as a day on its own (book a taxi for the TF-24, where there is no bus), and start the through-walk at La Caldera.
TITSA line 345 links La Caldera with La Orotava and Puerto de la Cruz. Each stage page lists the bus stops near its start and finish; check lines and timetables with TITSA.
Prepare each stretch while you still have a connection; mobile coverage is patchy in the forest and the caldera.
Keep your route and maps on your phone for places without a signal. Downloads stay in the browser you make them in, so use the phone and browser you will have on the trail.
Choose your route or stages. Choose Prepare offline above. Wait for the route and maps to finish downloading.
Try it before leaving coverage. Switch offline, close and reopen the browser, then use My Hikes to start navigation. Repeat for every part you will need.
Saving a bookmark is not a map download. Storage can be cleared by your device; keep a backup map for remote trips.
GR 131 Tenerife — frequently asked questions
How long is the GR 131 Tenerife, and how many days does it take?
About 84 km in 5 sections on our map. The guide's day planner offers a 4-day plan on the overnight stops, and you can choose your own nights.
When is the best time to walk the GR 131 Tenerife?
All year, with care in winter. The Las Cañadas stretches reach about 2,400 m: winter nights are near freezing and snow or ice is possible from January to March.
How do you get to the start of the GR 131 Tenerife, and back?
Tenerife North is closest to La Esperanza; Tenerife South is closest to Arona and Vilaflor. The "Connect your journey" section has the travel details, with 1 more travel note.
Do you need to book on the GR 131 Tenerife?
Book the Parador first: it is the only hotel inside the national park.
Can I download the GPX of the GR 131 Tenerife?
Yes: the route on our map and every section, free, for a GPS watch or a phone. The guide also saves your plan for offline use in the app.
Is the GR 131 Tenerife open? Where are closures announced?
Closures we know of are shown on the days and sections they affect, in the day planner and on the stage pages. We watch 3 official notice pages (Cabildo de Tenerife: mouflon control; Tenerife ON: alerts; Tenerife ON: GR 131 incidents); the date we last read them is shown with the notices on this page. Check them again before you set off.
Route & sources
Route map & sources
The map follows the OpenStreetMap relation of the GR 131 (Camino Natural Anaga-Chasna, relation 1122328, operated by the Cabildo de Tenerife), cut at the five stretch ends Turismo de Tenerife publishes. It measures 84.4 km; the official stretches add up to 85.0 km. Turismo de Tenerife lists the official approval of all five stretches as in progress. The Cabildo's Tenerife ON map shows most of stretch 1 closed since the 2023 forest fire (read 18 September 2026); the plans here keep to the open route.
Official guidance and mapped-source comparison checked 18 September 2026. Map data is a route reference, not confirmation of today's path, weather or accommodation availability.
Checking snow-monitoring coverage... Notifications require permission on this device; on iPhone use the installed Home Screen app. No email alerts are sent.