Skip to content

Kumano Kodo Nakahechi

The imperial pilgrimage route across the Kii mountains, walked as the pilgrims walk it: from Takijiri-oji by Takahara, Chikatsuyu and Tsugizakura to Kumano Hongu Taisha, inn to inn, with the buses at each end.

35.9 km mapped route

Loading your plan…

3-day plan

Loading topographic map…
200m400m600m010 km20 km30 km35.9 km690m94m
Flat (<5%) Gentle (5–10%) Moderate (10–15%) Steep (15–25%)
Each day in its own colour, numbered where it starts; the rest of the Kumano Kodo Nakahechi in grey. Select a day for its elevation and 3D flyover.

Route details

Compare with others
36 kmMapped distance
1,869 mMapped ascent
5Route sections

Best season: March to May and October to November. Open all year; spring and autumn are the popular seasons, the Tanabe City Kumano Tourism Bureau says, its autumn peak from September to November, though September is among the wettest months on its climate graph. Summer is hot, humid and wet, and typhoons bring floods and landslides: check the weather and ask your inn each morning. From late December to February the passes can have frost and snow, and the days are short. Before you go

Plan your days

Five sections from Takijiri-oji to Kumano Hongu Taisha, a village with small inns at the end of the first three. The inns decide the plan: book them first.

Make your own plan

No departure date chosen. Add your first day to check stays, dated closures and daylight. Snow conditions describe today.

Changing the pace or where you stay suggests a new number of days: the fewest that keep each day under 8 h of walking and in daylight, where a place to stay allows.

Choose your nights (2 nights)

Days end where the route has a stay, a camp or a village.

Checks for the whole plan. A planned overnight stop is not a booking.

Your dates

Checking the seasons, closures and current conditions for today…

Day by day

  1. Day 1

    Takijiri-oji to Takahara

    Stage 1

    Distance
    3.8 km
    Climb
    +399 / −159 m
    Walking
    2 h 30Tanabe City Kumano Tourism Bureau time 2 h–3 h; measured on the mapped line 1 h 35

    Stage 1: A steep climb from the shrine through forest, past the Tainai-kuguri rock cave, to the hilltop village of Takahara: about 4 km, 2 to 3 hours and 430 m of climb. No bus reaches Takahara itself.

    Takahara Town or village

    A ridge-top village with a handful of inns, among them Kiri-no-Sato Takahara Lodge, which has a restaurant; KUMANO TRAVEL lists 8 places in Takahara itself and more in Kurisugawa below, a drive away, some with a pick-up. No bus reaches the village; Kurisugawa on route 311 is about 30 minutes down.

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 1 GPX Open in Planner

  2. Day 2

    Takahara to Tsugizakura-oji

    Stage 2, Stage 3

    Distance
    12.7 km
    Climb
    +822 / −641 m
    Walking
    5 h 15Tanabe City Kumano Tourism Bureau time 5 h 15; measured on the mapped line 4 h 32

    Stage 2: Over the ridges by Jujo-oji, a clearing where many stop for lunch, and the old teahouse site at Uwadawa-jaya (about 690 m), to the rest stop at Gyuba-doji-guchi (a restaurant, 9:00 to 17:00, closed Thursdays and 1 to 3 January) and down to Chikatsuyu: about 9.3 km, 3½ to 4½ hours.

    Stage 3: Up from Chikatsuyu to Nonaka and Tsugizakura-oji, under its great cedars: about 4 km, 1¼ hours. Nonaka's inns lie around the shrine and below it.

    Tsugizakura-oji Town or village

    Nonaka, strung along the old road around the shrine and the Nonaka Ipposugi bus stop: KUMANO TRAVEL lists 11 places, nearly all with supper. The last beds before Hongu, apart from two in Fushiogami, about 3 km short of it.

    Find your own accommodation; TrailSplits has not checked what is open.

    Day 2 GPX Open in Planner

  3. Day 3

    Tsugizakura-oji to Kumano Hongu Taisha

    Stage 4, Stage 5

    Distance
    19.5 km
    Climb
    +648 / −1,054 m
    Walking
    9 h 30Tanabe City Kumano Tourism Bureau time 8 h–11 h; measured on the mapped line 6 h 12

    Stage 4: The long day through the mountains, by Kobiro-toge and the Iwagami-oji stretch, reopened on 1 October 2025, to Hosshinmon-oji: about 13.5 km, 6 to 8 hours. No restaurants: bring lunch. From Kobiro-toge there is no water source until the vending machines at Hosshinmon-oji.

    Stage 5: From Hosshinmon-oji by Fushiogami down to Kumano Hongu Taisha: about 7.5 km on the Bureau's section page, 6.8 km on its route map and on this line, 2 to 3 hours. A very popular walk on its own, by bus to Hosshinmon-oji.

    Day 3 GPX Open in Planner

Longest day: day 3, 8 h–11 h.

How these plans are made

Days end at a stage end with a refuge or a village, or in a village the route passes through. Walking times are the times published by the Tanabe City Kumano Tourism Bureau where a stage has one, with the time measured on the mapped line beside it; a day that walks part of a stage gets a share of the stage's time by distance and climb.Outside Switzerland our walking times often run short of the times route operators publish; treat them as optimistic. Running times use 7.5 km/h plus one hour per 700 m of climb: a steady reference, not a prediction. Daylight is sunrise to sunset where the day starts; the time left is for breaks, meals and delays. For villages we count the places to stay OpenStreetMap lists; we have not checked which are open. A plan is not a booking: reserve every night before you commit to these day lengths.

Weather this week

Loading the forecast for low point (85 m) and high point (700 m)…

Weather by month

Typical weather on this trail: at the lowest point (85 m) and the highest point (700 m). Select a month to see why it is rated as it is.

Monthly climate averages and daylight
Month
WeatherMixedMixedGoodGoodGoodMixedMixedMixedMixedMixedGoodGood
Stages rated good on typical weather0/52/55/55/54/50/50/50/50/50/55/55/5
High point, day / night6°/-1°7°/0°10°/3°15°/8°19°/12°22°/16°26°/20°27°/21°24°/18°19°/12°14°/7°9°/1°
Low point, day / night10°/2°11°/3°14°/6°19°/11°23°/15°26°/19°29°/23°31°/24°28°/21°23°/16°18°/10°13°/5°
Rain, mm668513817019129624919727123213572
Snow at high pointPossiblePossible–––––––––Frost
Daylight10 h 0810 h 5711 h 5513 h13 h 5314 h 2314 h 1213 h 2712 h 2611 h 2410 h 269 h 56

Source: TerraClimate 1991–2020 monthly averages. Averages for the area at each point’s elevation (4 km grid, corrected for height). Not a forecast or a report of current trail conditions. Snow at the high point is estimated with a simple snowpack model from these temperatures and precipitation, not observed; steep islands and high summits can hold more snow than it shows. Daylight is for the 15th of each month. Hut, transport and park seasons are separate: check them for your dates.

Before you go

Prepare for the Kumano Kodo

Arrange your stays, food and travel first, then check conditions again near departure.

Book the inns first

Takahara, Chikatsuyu and Nonaka have limited beds, mostly small inns with dinner and breakfast, and they fill up in spring and autumn: book as early as you can. The Bureau's KUMANO TRAVEL site opens bookings six months or more ahead, a request can take up to a month to confirm in the peak seasons (New Year, Golden Week in early May and Obon in mid-August), and it stops taking bookings 20 days before the night; a daily luggage shuttle carries bags between inns booked there. Aim to arrive between 15:00 and 17:00.

Stamps and the Dual Pilgrim

Stamp boxes stand at 18 points from Takijiri-oji to Kumano Hongu Taisha, and the credential is free. Walk this route and the Camino de Santiago and register at the Hongu Heritage Center or the Tanabe Tourist Information Center to become a Dual Pilgrim.

The Bureau: Dual Pilgrim

Weather and wildlife

Summer is hot and wet, and typhoons bring floods and landslides: ask your inn each morning. Mamushi vipers, giant hornets, leeches and ticks live along the way; bears are rare, and the Bureau notes that the attacks in the news are almost all in northern Japan. Put rubber caps on walking-pole tips.

The Bureau: tips for walking

Short days in winter

Arrive between 15:00 and 17:00 and carry a light, the Bureau says; in December the sun rises about 6:55 and sets about 16:53. The last day to Hongu, 21 to 24 km and 8 to 12 hours with breaks, barely fits that daylight: start at first light, or shorten it by the 7:23 bus from Chikatsuyu-oji (7:29 from Nonaka Ipposugi) to Doyukawa-bashi (about 17 km from Hongu), as KUMANO TRAVEL suggests. From December to March the last bus from Hosshinmon-oji leaves at 14:48.

The Bureau: tips for walking

Closures and notices last checked 12 October 2026: Tanabe City: Nakahechi trail status · Kumano Tourism Bureau: detours and closures · Kumano Tourism Bureau: notices (Japanese). Check them again before you set out.

Getting there

Connect your journey

Choose a stage or journey above to narrow the travel searches.

Google Maps journey searches, not confirmed services. A mountain endpoint may need a booked transfer or an additional walk.

Kii-Tanabe to Takijiri

The Bureau advises the night before in Kii-Tanabe: from Osaka or Kyoto on the day, even the earliest train and bus leave too little time to reach Chikatsuyu or Nonaka, so only Takahara is within reach, as in the 3-day plan. Buses from Kii-Tanabe station reach Takijiri in 36 to 38 minutes (¥970), from 06:16; in busy seasons the 08:30 and 08:37 fill up, so the Bureau suggests an earlier one. From 19 September 2026, and only until 10 December 2026, an extra express bus leaves Kii-Tanabe at 06:55 for Takijiri (07:27) and Hosshinmon-oji (08:54). A taxi is about ¥8,000.

The Bureau: buses

Back from Hongu

Buses from Hongu Taisha-mae reach Kii-Tanabe in about 1 h 40 to 2 h 10 (¥2,100), the last at 16:40; Shingu in about 1 hour, or 1 h 15 to 1 h 25 on those that go round by Yunomine and Kawayu (¥1,560), the last at 18:58; and Yunomine onsen in 10 to 20 minutes (¥310).

The Bureau: buses

Take your trip with you

Offline maps

Prepare every day while you still have a connection, and test it offline before you set out.

Keep your route and maps on your phone for places without a signal. Downloads stay in the browser you make them in, so use the phone and browser you will have on the trail.

  1. Open this trail on your phone. Use the browser you will have on the trail: downloads stay in that browser.
  2. Choose your route or stages. Choose Prepare offline above. Wait for the route and maps to finish downloading.
  3. Try it before leaving coverage. Switch offline, close and reopen the browser, then use My Hikes to start navigation. Repeat for every part you will need.

Saving a bookmark is not a map download. Storage can be cleared by your device; keep a backup map for remote trips.

Kumano Kodo Nakahechi — frequently asked questions

How long is the Kumano Kodo Nakahechi, and how many days does it take?

About 36 km in 5 sections on our map. The guide's day planner offers plans from 2 to 3 days on the overnight stops, and you can choose your own nights.

When is the best time to walk the Kumano Kodo Nakahechi?

March to May and October to November. Open all year; spring and autumn are the popular seasons, the Tanabe City Kumano Tourism Bureau says, its autumn peak from September to November, though September is among the wettest months on its climate graph.

How do you get to the start of the Kumano Kodo Nakahechi, and back?

The Bureau advises the night before in Kii-Tanabe: from Osaka or Kyoto on the day, even the earliest train and bus leave too little time to reach Chikatsuyu or Nonaka, so only Takahara is within reach, as in the 3-day plan. The "Connect your journey" section has the travel details, with 1 more travel note.

Do you need to book on the Kumano Kodo Nakahechi?

Takahara, Chikatsuyu and Nonaka have limited beds, mostly small inns with dinner and breakfast, and they fill up in spring and autumn: book as early as you can.

Can I download the GPX of the Kumano Kodo Nakahechi?

Yes: the route on our map and every section, free, for a GPS watch or a phone. The guide also saves your plan for offline use in the app.

Is the Kumano Kodo Nakahechi open? Where are closures announced?

Closures we know of are shown on the days and sections they affect, in the day planner and on the stage pages. We watch 3 official notice pages (Tanabe City: Nakahechi trail status; Kumano Tourism Bureau: detours and closures; Kumano Tourism Bureau: notices (Japanese)); the date we last read them is shown with the notices on this page. Check them again before you set off.

Route & sources

Route map & sources

The Tanabe City Kumano Tourism Bureau gives about 38 km from Takijiri-oji to Kumano Hongu Taisha (its route map of May 2026: 37.1 km), in sections that end at Takahara, Chikatsuyu, Tsugizakura-oji and Hosshinmon-oji. The line here is the route on OpenStreetMap (relation 17094646, planet of 21 September 2026), walked in the pilgrims' direction, 35.9 km, cut at those section ends. The times are the Bureau's section times, which include breaks; its difficulty table gives about 6½ hours of walking for the 21 km from Tsugizakura-oji to Hongu that its section pages put at 8 to 11.

Official guidance and mapped-source comparison checked 27 September 2026. Map data is a route reference, not confirmation of today's path, weather or accommodation availability.

Tanabe City Kumano Tourism Bureau: the Nakahechi
Sources we read (12)

Map data © OpenStreetMap contributors · Source relation

Planning ahead?

Checking snow-monitoring coverage... Notifications require permission on this device; on iPhone use the installed Home Screen app. No email alerts are sent.