Skip to content

Sagamiko to Uenohara

Kōshū Kaidō · Stage 5

10.1 km mapped route

By the old post towns of Yose, Yoshino and Sekino along the Sagami river valley to Uenohara on its terrace: 10.1 km, +239 m.

Sagamiko to Uenohara

Loading topographic map…
150m200m250m300m02 km4 km6 km8 km10 km295m183m
Flat (<5%) Gentle (5–10%)
Green: Sagamiko to Uenohara. Grey: full trail. Elevation follows this mapped track.

Route details

Walking time measured on the mapped line (TrailSplits time model, moving time; within 22 % on four in five test legs). Outside Switzerland our walking times often run short of the times route operators publish; treat them as optimistic. Climb measured on the mapped line, on terrain heights. No official time is published for this stage (verified as not published, read 13 October 2026); the time shown is measured on the mapped line. No municipality, prefecture or national walking body times exactly this stretch; Yamanashi Prefecture's model courses time other stretches of the old road.

10.1 kmStage distance
327 mAscent, measured
2 h 35Walking time, measured
5Stage number

Best season: Spring and autumn; the Sasago pass road closes in winter. No body manages the old road or publishes a walking season: the month table below is from climate normals. Most of the road is on town streets and main roads; in winter the Sasago pass holds snow and its road is closed to traffic. Before you go

Sagamiko to Uenohara

5 / 14
GPX

Where this stage starts and ends

Facts read from the guide's sources and OpenStreetMap on 29 September 2026. A page can change after we read it, so confirm with your accommodation before you rely on a date or a bed.

Stage start

Sagamiko

Town

Sagamiko (相模湖) station on the JR Chūō Line, over the Kobotoke pass from Takao. Two small inns are mapped nearby; Hachiōji, back down the line, has more.

OpenStreetMap lists at least 2 places to stay within about 1000 m (read 29 September 2026). TrailSplits has not checked which are open.

Stage end · overnight

Uenohara

Town

Uenohara (上野原), an old post town on its terrace above the Katsura river; the JR Chūō Line station is about 700 m below the road, not counted in the day's distance. One hotel is mapped nearby.

OpenStreetMap lists at least 2 places to stay within about 1000 m (read 29 September 2026). TrailSplits has not checked which are open.

Walking time for this leg

No operator walking time is quoted for this exact leg. Measured on the mapped line, the stage takes about 2 h 35 of walking.

Make it your trip

Walk by day, sleep in the towns

Every day ends at or near a railway station, but from Saruhashi to Fujimi most of them have no place to stay nearby: base yourself in Ōtsuki for the passes, in Kōfu for the basin, and in Kobuchizawa or Kami-Suwa for the last days, and ride the JR Chūō Line to and from each day's ends. In Tokyo, Fuchū and Hachiōji have hotels by their stations.

Nihonbashi to Hachiōji

Through Tokyo and its western suburbs: three flat city days.

Plan this journey

Hachiōji to Kai-Yamato

Over the Kobotoke and Sasago passes: the mountain section, with few places to stay; base in Ōtsuki.

Plan this journey

Kai-Yamato to Hinoharu

Through the Kōfu basin: stay in Kōfu and ride the train.

Plan this journey

Hinoharu to Shimosuwa

Up into Nagano and down to Lake Suwa and Shimosuwa.

Plan this journey

Weather this week

Loading the forecast for on the trail (241 m)…

Weather by month

Typical weather on this stage, around 181–301 m. Select a month to see why it is rated as it is.

Monthly climate averages and daylight
Month
WeatherMixedMixedGoodGoodGoodGoodMixedPoorMixedMixedGoodMixed
Day / night9°/-1°9°/0°12°/3°17°/7°21°/12°24°/16°28°/20°29°/21°25°/18°20°/12°15°/6°11°/1°
Rain, mm4651891061321741551751962077050
Snow at high pointPossiblePossible–––––––––Possible
Daylight10 h10 h 5311 h 5413 h 0314 h 0114 h 3314 h 2213 h 3312 h 2711 h 2110 h 199 h 46

Source: TerraClimate 1991–2020 monthly averages. Averages for the area at each point’s elevation (4 km grid, corrected for height). Not a forecast or a report of current trail conditions. Snow at the high point is estimated with a simple snowpack model from these temperatures and precipitation, not observed; steep islands and high summits can hold more snow than it shows. Daylight is for the 15th of each month. Hut, transport and park seasons are separate: check them for your dates.

Before you go

Prepare for the Kōshū Kaidō

Arrange your stays, food and travel first, then check conditions again near departure.

Streets and main roads

Most of the road is urban or follows main roads with traffic: keep to the pavements, and where a road has none, walk facing the traffic. Through Hachiōji the old road is the national highway.

The old road on OpenStreetMap

Black bears

Black bears live in the mountains along the road: Hachiōji city lists its western mountains, where the Kobotoke pass is, as bear habitat, and Hokuto city recorded a bear about 250 m from Hinoharu station on 11 October 2026, and others within 1.3 km of it since June, with sightings from late June to late November. On the pass and hill days carry a bell or radio, walk in company where you can, stay off the paths at dawn, dusk and after dark, and check the cities' sighting pages before you go.

Hachiōji city: bears and hikers

Summer heat

Most of the road is asphalt with little shade, and the Kōfu basin (days 9 to 11) is among the hottest places in Japan in July and August. In summer start at first light, carry more water than you think, and rest through midday.

Kōfu (climate table, Wikipedia)

The two passes

The Kobotoke pass (day 4, 548 m) and the Sasago pass (day 8, 1,096 m) are mountain paths and old roads, with no shops between the stations. The road over the Sasago pass closes every winter, to walkers as well as cars, last winter from 15 December to mid-April: check Kōshū city's notice for this winter's dates, and in that season take the train from Sasago to Kai-Yamato.

Kōshū city: winter closure of road 212

Getting there

Connect your journey

Travel around Sagamiko to Uenohara.

Google Maps journey searches, not confirmed services. A mountain endpoint may need a booked transfer or an additional walk.

To Nihonbashi

The walk starts at the Nihonbashi bridge in central Tokyo, by Nihombashi and Mitsukoshimae subway stations and a short walk from Tokyo station.

Kōshū Kaidō (Japanese Wikipedia)

Trains along the road

The JR Chūō Line follows the road from Hachiōji to Shimosuwa, and the Keiō Line in the Tokyo suburbs: every day of this guide ends at or within about 1 km of one of their stations. At the smaller mountain stations, check the timetable before you set out.

The old road on OpenStreetMap

Take your trip with you

Offline maps

Prepare every day while you still have a connection, and test it offline before you set out.

Keep your route and maps on your phone for places without a signal. Downloads stay in the browser you make them in, so use the phone and browser you will have on the trail.

  1. Open this trail on your phone. Use the browser you will have on the trail: downloads stay in that browser.
  2. Choose your route or stages. Choose Prepare offline above. Wait for the route and maps to finish downloading.
  3. Try it before leaving coverage. Switch offline, close and reopen the browser, then use My Hikes to start navigation. Repeat for every part you will need.

Saving a bookmark is not a map download. Storage can be cleared by your device; keep a backup map for remote trips.

Route & sources

Route map & sources

The line is the old road as mapped on OpenStreetMap (relation 9561988, 甲州道中, planet of 27 September 2026), 215.9 km from Nihonbashi to Shimosuwa, mostly on town streets and main roads; through Hachiōji the old road is the main road, walked on its pavements. The days end at railway stations on or near the road, most in its old post towns: TrailSplits chose them, not an authority, and the walking times are our estimates. No municipality, prefecture or national walking body publishes a time for these stretches (verified as not published, read 13 October 2026); Yamanashi Prefecture's Sasago pass course has stage 8's ends but follows a longer line.

Official guidance and mapped-source comparison checked 29 September 2026. Map data is a route reference, not confirmation of today's path, weather or accommodation availability.

Kōshū Kaidō and its post towns (Japanese Wikipedia)
Sources we read (5)

Map data © OpenStreetMap contributors · Source relation